Ballmac UI home
Changelog

Timelines, org charts and privacy settings

A project timeline, an org chart, data and privacy settings, customer stories and an integrations directory.

The Gantt 1 block, a project timeline with bars, milestones and dependency arrows.

New

  • Gantt 1 places bars by real dates with progress, milestones, dependency arrows (a task that starts before what it waits for shows its arrow backwards), a today line, three zoom levels and a hidden table for screen readers; late work shows an icon and the word Late.
  • Org chart 1 draws connected person cards with a count toggle per team, search that opens the path to a person, and the standard tree keys; connectors and keys mirror in right to left.
  • Settings 6 handles data and privacy: request an export in JSON or CSV with a labelled progress bar, set how long messages are kept, and delete the account behind a typed email with a 30-day grace period you can cancel.
  • Case study 1 features one story with its quote and results counting up, a grid of the others with a headline number each, an industry filter, and pictures drawn from each company's name, so no image files are needed.
  • Integrations 1 lists integrations with highlighted search, category counts that follow the search, "Connected" in words, and a side sheet whose Connect button handles the wait and a failure.

Improved

  • The MCP server finds the new groups for gantt, schedule, orgchart, hierarchy, privacy, gdpr, export, customers and marketplace.
  • All five pass every scorecard check, including 360 px (checked to 320 px), reduced motion and right to left (the Gantt timeline runs left to right in every language, like a chart), and ship their tests.

Fixed

  • The hidden usage table in Dev 1 is now wrapped so it can never widen the page on a phone.